This is a necessary prerequisite for the org.broadinstitute.variant migration.
-Picard and sam-jdk go from version 1.67.1197 to 1.84.1337
-Picard-private goes from version 2375 to 2662
-Tribble goes from version 119 to 1.84.1337
-RADICALLY trimmed down the list of classes we extract from Picard-private
(jar goes from 326993 bytes to 6445 bytes!)
This is an intermediate commit so that there is a record of these changes in our
commit history. Next step is to isolate the test classes as well, and then move
the entire package to the Picard repository and replace it with a jar in our repo.
-Removed all dependencies on org.broadinstitute.sting (still need to do the test classes,
though)
-Had to split some of the utility classes into "GATK-specific" vs generic methods
(eg., GATKVCFUtils vs. VCFUtils)
-Placement of some methods and choice of exception classes to replace the StingExceptions
and UserExceptions may need to be tweaked until everyone is happy, but this can be
done after the move.